If you need any details or samples, remember to get in touch with us and you will have our before long reply. Thanks to our vast solution variety and abundant ordeals in this industry, Additionally, all our generation processes are in compliance with ISO9002 standards. one interval Composition of horizontal EPTT box
EPTT box comma passive EPTT shaft comma EPTT EPTT shaft comma spiral EPTT shaft set and EPTT asix comma oil box comma bearing and support base of bearing period
2 interval EPTT traits
Box is soften with thick steel with fantastic high quality to get to the large intensity amp hefty load potential that the situation essential period Situation ought to just take stress ageing treatment ahead of the produce to get to the stability that necessary period of time In orEPTTto make sure the set up precise stXiHu (West Lake) Dis.Hu (West Lake) Dis.rd comma box require to undertake overall assemble create time period
EPTT EPTT shaft and passive EPTT shaft use carbon steel parts to forge comma Tooth surface area making use of the carburizing methods to achieve high hardness comma in orEPTTto make certain the loading and massive EPTT length need of EPTT period Soon after ending the set up comma the balXiHu (West Lake) Dis.Hu (West Lake) Dis.ng take a look at is necessary to take comma the speed need to be 600 r sol min comma the stability degree is G6 period3 to fulfill the demand precise of making use of time period
Spiral EPTTl EPTT set comma use carbon metal blank comma spiral EPTTl area knowledge the carburizing and quenching therapy to get the hardness that essential comma insure the weighty load chance of EPTT shaft and massive EPTT length period of time Grinding the tooth surface and roll holes to achieve the required substantial precision amp durableness of spiral EPTTl EPTT established period of time
When the assemble finished comma the no-loading test ought to be maintain 2-4hours comma the velocity is 1200r solmin comma the temperature of shaft should not exceed 40 ordm C comma the perform of EPTT ought to be clean comma no hitting sounds and irregular concussion comma every joint surface area must not have oil spill phenomenon period of time Vibration depth must not exceed 4mm sols
Product | vertical pre-ending mill EPTT box |
balance amount | G6.three |
no-loading check | preserve two-4hours, |
Warranty | one-three Years |
After EPTT Provider | Engineers Accessible to Support OverEPTT |